In a great many of the renovation projects I come across, one part of the program involves raising the floor in the deep end of the pool to create the classic play-pool contour with a deeper area in the middle and shallower sections on both ends. This retrofit brings these pools into line with one of the most popular features of today’s new pools, so many of which are set up for pool volleyball and other vigorous games.

The great thing about these sporty pools is that the shallower ends have a minimal effect on classic pool activities such as lap swimming. Moreover, raising the floor reduces water volume (and therefore water use and chemical consumption) and has the nice side effect of making the water warmer. No diving will be allowed, of course, but I don’t see that as a big issue and can’t think of the last time I installed a diving board on a typical backyard pool.

But getting back to renovations for the moment, there is a right way to raise the floor – and the contractor involved in the project discussed here definitely had the wrong one in mind.

The scenario: The contractor (using the term loosely) who had been brought in to update this pool demolished the existing concrete decks and the brickwork around the pool. Instead of hauling it away (as would have been the right thing to do), he simply dumped it all into the deep end of the pool, painted bricks included, and made no attempt to consolidate or compact the material. The plan was to encase everything under a thick layer of new gunite/concrete, never to be seen again – or at least that seems to have been the contractor’s basic assumption. There was no intention to install any steel to tie the original floor to the new sub-floor.

The debris material was in chunks ranging in size from quite large to very small; the chunks also represented a range of materials, from plaster, stucco, tile and concrete to the odd plastic component and a good measure of dirt and gravel. As indicated above, none of this had been compacted, and I can only imagine what would have started happening as this layer of material settled and shifted over time.

The fix: The right approach here would require the contractor to clear away all of the material in the bottom of the pool and follow established procedures for doing the job the right way.

First, holes for reinforcing bars must be drilled into the existing shell in a pattern and at intervals recommended by the project engineer. (Where I work, those holes must be examined by a deputy inspector before the rebar is set in place with epoxy.) Once the steel is in place and has been tied into an appropriate curtain, it’s time to fill the bottom with a load of solid concrete, gunite or a sand slurry.

If the void to be filled is deep, it’s permissible to use a fill material – but it must be of a uniform size and must be compacted in stages (or lifts) as the space is filled to the level where the concrete takes over.

Lesson Learned: It’s too easy to make assumptions about the integrity and strength of concrete, and it’s clear in this case that the contractor figured a mass of concrete poured over a heap of rubble would be just fine. And it might have been fine – but only for a while; before long, the concrete would start to crack and the inadequacies of the slipshod approach would be discovered.

As always, there are right ways and wrong ways to renovate details of existing pools, and it’s not too difficult to ask a few well-placed questions to find out if you’re headed in the right direction!

Share this article:

Facebook
Twitter
LinkedIn
Recent Articles
Acrylic sphere water feature with integrated LED lighting designed by Scott Cohen & The Green Scene

Sculpture on the Side

In this WaterShapes feature, Scott Cohen uses The Green Scene’s PHTA award-winning “Side Hustle” project to show how an overlooked side yard can become one of a property’s most distinctive spaces. He covers working with tight site constraints instead of against them, layering hardscape, water, light and planting to add depth without adding footprint, and designing for sound and atmosphere as much as looks. His conclusion: good watershape design isn’t always about going bigger, but about making a small space matter more.

Read More »
California Business and Professions Code section 7159

What Must Be Included in a California Home Improvement Contract?

Many California home improvement contracts fail to meet the state’s strict legal requirements — and the consequences can be severe. Drawing on more than 24 years as a CSLB Industry Expert, this guide breaks down the 19 elements every compliant contract must include, from proper font sizes to swimming pool project disclosures, and explains why a defective contract can leave a contractor unable to collect payment.

Read More »
Illustrated construction crew at a home build site, with a foreman in a hardhat holding blueprints and a clipboard in the foreground, surrounded by tradespeople including an electrician, plumber, excavator operator, safety inspector, mason, and landscaper, representing the subcontractors covered under California's 2026 disclosure law.

California’s New 2026 Subcontractor Disclosure Requirement

Starting January 1, 2026, California home improvement contracts must disclose whether subcontractors will be used on a project — and if so, provide their names, license numbers, and classifications upon request. SB 517’s amendment to Business and Professions Code section 7159 adds new Yes/No disclosure boxes to contracts and change orders. Contractors still using pre-2026 templates risk CSLB discipline — and for pool contracts specifically, non-compliance can render the agreement void and unenforceable.

Read More »

Contact Scott Cohen